Remodeling your Kitchen Remodeling and kitchen design is one of the best
investments a homeowner can make. For most homeowners the kitchen is the most important room in the
house. It is used for cooking, eating, and gathering, and is typically a
focal point in the home. Consequently, though a great investment, a
kitchen remodeling plan can be very disruptive to the family. And the length
of the disruption can take as long as two or three weeks.
Do It Yourself Remodeling your Kitchen Design
and Planning Stage
Kitchen design and planning is absolutely essential in
remodeling a kitchen. A homeowner needs to ensure the Kitchen design and costs
will meet their functional requirements and budget. The homeowner should first
identify the main objectives of their future kitchen.
They should next research the latest products on the market
including: cabinets, countertops, appliances, and flooring. If the kitchen is
more than 5 years old, there are a lot of new products to choose from.
For example, Silestone is quickly surpassing Granite and
Corian, as the premier countertop surface as it is extremely hard, elegant in
appearance, and comes in many colors. For cabinets, the trend appears to
be towards lighter colors as they help the appearance of lightening and
enlarging a room.
In regards to appliances, the Stainless Steel look appears
to be in.
And for flooring, vinyl or wood is the trend. Tile looks nice, however,
it can be unforgiving in a room where things tend to get dropped. In addition,
if there is no radiant heating planned for the floor, tile has the tendency to
feel cold on the feet.
Sketch out some Kitchen Design plans
After the main objectives of remodeling your kitchen project have been
identified and the homeowner has an idea on the products for it, they should
next sketch some design plans. I would suggest developing two or three sketches,
keeping in mind three important points. First, professional kitchen designers
like to think of a triangle when starting a new design. The three points of the
triangle include the Sink, Refrigerator, and Stove. Make sure your sketches
consider this as it will ensure a good functional kitchen. Second, consider
adequate walking areas and space for an eating area, such as a table or center
island, with applicable space included for chairs. I would suggest that the
walking areas be wide enough for two people to walk through at the same time.
The sketches should also include dimensions, as these will be needed when
meeting with the Kitchen Designer. Finally, consider where the existing outlets
and power for the stove are, and assess if additional outlets will be needed or
old outlets relocated.
Visiting the Kitchen Remodeling Design Center
Once sketches have been created, bring them to a Kitchen
Design Center or Home Improvement store. A certified Kitchen Designer will then
take the sketches and goals and incorporate them into a formal set of plans.
Once the Kitchen Designer has formally generated the plans, typically someone
from the Kitchen center will visit your home and take very precise measurements
so that the plans can be finalized. In fact, make sure that they do visit your
home; otherwise unexpected costs and delays could occur when the wrong size
cabinets arrive on your doorstep.
When the cabinets do arrive at your doorstep, ensure that
they match the list of materials generated by the Kitchen Designer. Again, this
will help ensure that no delays or unexpected costs arise during the actual
remodeling process.
Cabinets: Out with the Old and In with the
New
Once the cabinets arrive, the cabinet installers will
remove the existing cabinets and countertops, unless the homeowners decide to do
this themselves, and install the new cabinets. If new flooring is planned, I
would suggest installing the flooring between removing the old cabinets and
installing the new ones, as this will save time and money. In addition,
particularly with Linoleum, you will get a better end product, as the Linoleum
will be unable to lift-up over time, if the material goes under the cabinets. If
new flooring does get installed prior to the cabinet and countertop
installation, additional care will be needed to ensure the floors are not damage
during this process.
Find a Qualified Kitchen Remodeling Contractor in Your Area
Get Free Quotes. Easy, Quick and No
Obligations!
For the home improvement or home remodeling project that is
too big for you, check out our partner
NeedContractor. They are a national
resource for finding pre-screened, insured, and licensed home improvement and remodeling contractors in your local area.
Get Matched in 48 hours with Kitchen Remodeling
Contractors!
Installing the Kitchen Countertops
After the new cabinets have been installed, measuring and
templating for the new countertops will be required if Silestone, Granite or
Corian are to be used. This task should be planned in advance so that it can be
performed the same day the cabinets are installed. This will help to reduce the
disruption time. Once the templating has been completed, expect several days to
a week for the countertops to actually be cut and installed. During this
interval the Kitchen Design Center should install a temporary countertop and
faucet so that your kitchen remains operational.
Though remodeling your kitchen can be a huge disruption to the
homeowner, the finished product will quickly erase the brief inconvenience.
Between its new and contemporary look and features, and the knowledge of making
a sound investment, the homeowner will swiftly forget about the disruption as
they fully enjoy their new kitchen.
For more
help on remodeling your kitchen, see HomeAdditionPlus.com’s
Kitchen
Remodeling Bid Sheet. TheKitchen Remodeling Bid Sheetwill help ensure that your kitchen remodeling project goes smoothly and you get
the finished kitchen you are
looking for. In addition, it will help to ensure that your remodeled kitchen will be accomplished on time and on budget.
How to Finance your Kitchen Remodeling Project -
can help provide funds for your new home improvement project if financing is
required.
If you are remodeling your kitchen, shop online forA
Kitchen Sink, cabinets, carts and more. Everything you need for
your newly designed kitchen can be shipped right to your home.
Additional Kitchen Design and Kitchen
Remodeling Resources
Kitchen Faucets and Appliances from Amazon.com
Kitchen Remodeling Price Quotes For FREE,
No Obligation!
Fill out our 3-5 minute quick and easy form, and receive a free price quote
on kitchen remodeling from one of our prescreened and licensed kitchen
remodeling contractors. This process is free and there is no obligation to
continue once you receive your kitchen remodeling price estimate.